Rig 11 Inspection

National Oil Wells Drilling and Workover Company (NWD) is pleased to invite you to send us an offer to inspecting Rig 11, in accordance with the specified scope of work.

For your information, the rig is located in the wan baloul district, approximately 120 km from the Wafa field.

We look forward to receiving your offer at your earliest convenience.

   Tubular

1-Kelly.

2-Drill pipe 5”  ( + – 350 jts ) DS-1 CAT4

3-Drill pipe 3 1/2” ( + -340 jts ) DS-1 CAT4

4-BHA. DS-1 CAT4 ( Various sizes ) + – 155 jts

5-Subs.DS-1 CAT4 ( + – 60 Subs Various sizes )

6- Handling Equipment 

7- Lifting Gear

Tubular body

 1.   Visual Tube

2. OD Gauging

3. UT Wall Thickness checks

4. Electromagnetic Scanning

5. MPI/Slip Area

6. UT Slip Area

– Tool Joint

 1. Visual connection

2. Fluorescent MPI of connection

3. Thread profiling w/gauge

4. OD/ID Gauging

5. Seal width/Condition

6. Shoulder width

7. Bevel Diameter

8. Need the following:

9.  Inspectors Qualification.

10.  Technical & Commercial offer.

11. Closing date on 05/05/2026 @ 12:00 PM.

12. Therefore, The subcontractor Confirm the readiness for inspection when asked to.

Note:

      Priced offer ( drillingrfq@nwd.ly )

      Unpriced offer ( drilling@nwd.ly )

Be the first to comment

Leave a Reply

Your email address will not be published.


*