NWD is extending an invitation to qualified inspection companies to participate in the forthcoming Request for Quotation (RFQ) for API RP 4G CATEGORY III inspections scheduled for the following rigs
| Rig no | Rig Model | Rig type | Inspection required | To be inspected | Location |
| Rig 7 | Oilwell 760M | Drilling rig | API API 4G CAT III INSPECTION | Mast and substructure | Nafoura field |
| Rig 8 | Oilwell 760M | Drilling rig | API API 4G CAT III INSPECTION | Mast and substructure | Sharara (South P) |
| Rig 11 | Oilwell 2000 E | Drilling rig | API API 4G CAT III INSPECTION | Mast and substructure | Wafa |
| Rig 14 | Bomco ZJ/70D 450 | Drilling rig | API API 4G CAT III INSPECTION | Mast and substructure | Sareer field |
| Rig 15 | National 1500 HP | Drilling rig | API API 4G CAT III INSPECTION | Mast and substructure | Abuttifiel |
| Rig 24 | Kremco 600 | Truck mounted | API API 4G CAT III INSPECTION | Mast and substructure | Sharara |
| Rig 25 | Kremco 750 | Truck mounted | API API 4G CAT III INSPECTION | Mast and substructure | Mabruk Field |
| Rig 26 | Kremco 750 | Truck mounted | API API 4G CAT III INSPECTION | Mast and substructure | Al Feel field |
| Rig 27 | Kremco 750 | Truck mounted | API API 4G CAT III INSPECTION | Mast and substructure | Hamada |
| Rig 31 | Kremco 600 | Truck mounted | API API 4G CAT III INSPECTION | Mast and substructure | Erawin |
| Rig 34 | Loadcraft 750 | Truck mounted | API API 4G CAT III INSPECTION | Mast and substructure | Ammal field |
| Rig 36 | Loadcraft 750 | Truck mounted | API API 4G CAT III INSPECTION | Mast and substructure | Zelten |
Submission Guidelines and Requirements
NWD cordially invites your esteemed company to submit your technical offer. Kindly send the technical offer to the following email address: superintendent@nwd.ly
Additionally, the commercial offer should be sent to: Cost.control@nwd.ly
Please note that the closing date for receiving offers is 12th February 2026
Required Documents and Information
API License *
Inspector qualification and certification *
Company experience in this job for the last two years *
The requirement during the inspections *
Daily report from day one *
Final inspection report *
Leave a Reply